How Long Do Foundation Repairs Take?

Foundation repairs take between 1 to 3 weeks to complete. The timeline of foundation repairs will depend on a number of factors, including the location of damage, the amount of damage, and the home size. 

If workers had to deal with small issues, such as a minor house stump replacement, the whole process could be done in just a week. For more serious concerns, it can stretch the process up to 3 weeks.

In this post, we’ll discuss the factors affecting the foundation repair timeline.

Factors That Affect Foundation Repair Timeline 

These are the main factors that affect the timeline for foundation repair:

Location of Damage 

The location of damage significantly influences the foundation repair timeline. If the damage is easily accessible, such as on the exterior or in a basement, repairs can be more straightforward and quicker.

However, damage located under the home, in crawl spaces, or intertwined with critical structural elements can extend the timeline. This complexity often arises when foundation repair signs are initially subtle and worsen over time, requiring more intricate solutions.

Amount of Damage 

The extent of the damage is a crucial factor in determining the foundation repair timeline. Minor cracks or slight unevenness often require less time to repair.

Conversely, extensive damage, including major cracks, significant settling, or widespread erosion, demands more time-intensive interventions. The more severe the damage, the longer the repair process can take.

Home Size 

The size of the home directly impacts the foundation repair timeline. Larger homes have more area to cover, which can mean more ground to stabilise and more potential points of damage.

The weight of larger homes also adds complexity to repairs, as the foundation must be able to support the entire structure uniformly. Smaller homes, in contrast, often have a shorter repair timeline due to their compact footprint and lesser load.

Duration of Foundation Repairs

How Long Does Each Foundation Repair Method Take? 

The following details provide an estimate of how long the different underpinning types take to complete:

Underpinning 

Minor underpinning jobs can be completed in 1 day, while the more complex ones can take up to 7 days to finish. The duration depends on the extent of the damage and the size of the property. Careful excavation and precise placement of supports need time to ensure the structure’s stability and safety.

Restumping 

Restumping will take between 5 to 10 days to complete. The time frame varies based on the number of stumps to be replaced and the accessibility of the property’s subfloor.

Relevelling 

Relevelling will take between 3 to 7 days to complete. The duration is dependent on the extent of the unevenness and the method used, whether hydraulic jacking or other levelling techniques. This process is critical for rectifying imbalances in the foundation.